Sherith Israel completes retrofit

A crane hoists roofing material to the temple's historic dome.

A crane hoists roofing material to the temple’s historic dome.

ESPECIALLY SWEET MUSIC will rise up into the freshly repainted and retrofitted dome atop Congregation Sherith Israel’s historic home at California and Webster on June 9 at a special Shabbat service celebrating the end of a long-running renovation.

“We did it!” exclaimed David Newman, co-chair of the seismic retrofit campaign. “The Sherith Israel community has risen to the occasion.”

“We are in compliance with all of the city’s seismic requirements,” said former congregation board member Ellen Schumm, who has been involved with the project since its inception. “This building is so stable, it’s awesome.”

The $16 million project to strengthen the 1905 building — which survived the earthquake and fire the next year and served as a temporary courthouse during the rebuilding — was spurred by new standards established after the 1989 Loma Prieta earthquake.

The first phase of the project, completed in 2011, included an innovative engineering plan to reinforce the exterior walls of the sanctuary without affecting the elaborately painted interior walls. It also stripped away the salmon-colored paint that had been unwisely applied to the sandstone walls half a century earlier.

The second phase, just completed, involved reroofing, repainting and waterproofing the dome, removing the last vestiges of salmon paint and returning the dome to the color of the sandstone on the base. It also added solar panels on the roof and included work on nearly every other part of the building.

“Our beautiful sanctuary will be here — and be strong — for generations to come,” said senior rabbi Jessica Graf.

EARLIER: In a video from January 2011, the retrofit project was underway.